Mining Surveying

-MHSA act 17.2 Legal appointment  (where blast does not take place)
- Setting out of blast pattern
- Waste rock dump design
- Rehabilitation (slope design, storm water control and top soiling)
- Ore reserve stock audits
- Design of blast pattern
- Surface survey infrastructure update for DMR
- Surveying and tailing dam

 

Engineering & Surveying

-Volumetric surveys
-Setting out if infrastructure data
-Design transmission Line Surveys
-Establishment of survey control networks
-Topographical  survey
-Staking and measuring of spatial data
-Details survey (conventional methods)

 

Public Transport

-School Children
-Full and Half event
-Special and sport event
-Group booking
-Staff transportation
-Church Groups
-Logistics and couriers
-Cultural events